Permit path
Cosmetic painting and interior finishes may be exempt. Wall removal, structural changes, and changes to concealed systems need a separate scope review.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Cosmetic painting and interior finishes may be exempt. Wall removal, structural changes, and changes to concealed systems need a separate scope review.
Written limits of work; existing/proposed plans for alterations; wall and ceiling details where relevant; engineer or architect documents when required.
Framing and trade checks before closing walls where required, followed by applicable finals. A cosmetic scope does not automatically create an inspection requirement.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.