Permit path
Layout, wall, plumbing, electrical, and ventilation changes can bring different permit disciplines into one kitchen. Check current exemptions before defining the permit path.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Layout, wall, plumbing, electrical, and ventilation changes can bring different permit disciplines into one kitchen. Check current exemptions before defining the permit path.
Existing and proposed layout; fixture and appliance locations; scope by trade; contractor information; plans and specifications as required.
Trade rough-ins before concealment; building checks where applicable; required electrical, plumbing, mechanical, and building finals. Confirm the sequence on the permit card.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.