Permit path
Panel changes, new circuits, service upgrades, and equipment connections require a scope-specific permit review. Coordinate utility involvement when service work requires it.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Panel changes, new circuits, service upgrades, and equipment connections require a scope-specific permit review. Coordinate utility involvement when service work requires it.
Electrical scope, circuit/panel information, load and service documents as required, contractor details, and master-permit reference for subsidiary work.
Rough-in and final checks as applicable. Utility disconnect/reconnect or work-with inspections are separate coordination items when required.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.