Permit path
Repipes, water heaters, fixture relocations, drainage, and new connections have different permit and testing considerations. Define gas work separately if included.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Repipes, water heaters, fixture relocations, drainage, and new connections have different permit and testing considerations. Define gas work separately if included.
Fixture and piping scope; equipment details; layout/riser information and sizing where required; contractor records and connection approvals as applicable.
Underground or rough piping, applicable pressure/leak tests, and plumbing final. Confirm hold points before backfilling or concealing work.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.