Permit path
Confirm zoning, permitted use, setbacks, site constraints, and how the new area connects to the existing building. ADU eligibility must be confirmed locally.
THE SCOPE / THE PERMIT / THE INSPECTIONS
Planning guide, not a permit determination. Exact forms, exemptions, design documents, and inspections depend on the property, scope, jurisdiction, and issued permit.
Confirm zoning, permitted use, setbacks, site constraints, and how the new area connects to the existing building. ADU eligibility must be confirmed locally.
Existing/proposed site and floor plans; area/use information; structural and trade plans; utility and energy documents; supporting approvals required by the jurisdiction.
Foundation and framing stages, connection details, trade rough-ins, and finals as required. Confirm the authority’s occupancy or completion process for the actual scope.
These are City of Miami or Miami-Dade examples, not statewide forms. Julio confirms the authority for your address and obtains its current application and checklist.
Inspection stages are examples, not a complete inspection schedule. Do not cover work before required inspections. A passed inspection is not the same as a closed permit.
Sources reviewed October 20, 2026. Confirm current local requirements before applying.